Battery Believed to Have Sparked Fire at Burlington County, NJ Recycling Center

Lithium Ion Battery Shipping Label design
By TAPinto Mount Laurel Staff, November 19, 2026 


WESTAMPTON, NJ
— Burlington County officials are urging residents to follow proper battery disposal guidelines following a small fire that broke out at the Robert C. Shinn, Jr. Recycling Center last week.

The fire occurred in the afternoon of Tuesday, November 10 and was quickly discovered and extinguished by employees of OTC Services, which operates the County-owned facility in Westampton. No injuries or significant damage were reported, according to the Burlington County Department of Solid Waste and Recycling.

Officials believe the fire was caused by a battery that had been improperly discarded in a load of recyclables. The incident is the latest in a series of battery-related fires at the recycling center and aboard recycling trucks.

Single-use alkaline batteries should be disposed of in regular household trash.

Rechargeable batteries, including lithium-ion, nickel-cadmium (Ni-Cd), nickel-metal hydride (Ni-MH) and small sealed lead-acid batteries (SSLA/Pb), should be taken to an appropriate battery recycling or hazardous waste collection facility.

Certain types of batteries can also be recycled at participating retailers, including Home Depot, Lowe’s and Staples.

Residents looking for a convenient battery recycling location can use The Battery Network’s online drop-off locator. To find a nearby battery recycling location, visit The Battery Network’s drop-off locator.

Sign up for our free Data Center Reporter

Battery Believed to Have Sparked Fire at Burlington County, NJ Recycling Center Read More »

RCRA forced thousands of landfills to close. What happened to them?

A concrete path crosses a water way in a public park. Greenery and a power line are visible in the background.
Alton-Baker Park in Eugene, Ore., depicted on July 18, 2018, is home to a popular running trail and other opportunities for recreation. But documents uncovered in recent years revealed that the park’s eastern portion was built atop an unlined landfill developed before federal standards were in place. The discovery was a shock to residents, who now question whether the site is leaking pollution. The image by Gary Halvorson, Oregon State Archives is licensed under CC BY 4.0

For decades, the state of Oregon has been aware of the closed landfill beneath Alton-Baker Park in Eugene. A former sand and gravel pit, the Day Island Landfill accepted waste between 1963 to 1974, closing two years before the federal Resource Conservation and Recovery Act ushered in a new era of landfill regulations.

The landfill was sited just feet from the Willamette River, a drinking water source for several towns downstream. During its operational years, the landfill accepted roughly 950,000 tons of material, including municipal waste from Lane County and chemical waste from wood treatment company J.H. Baxter & Co., according to records first unearthed by Lookout Eugene-Springfield.

Now, residents are raising new questions about the site’s impacts on public health. Investigators have previously noted contamination in adjoining ponds likely caused by leachate that has seeped out of the facility. But responsibility for remediation has been passed along, with the EPA, then the Oregon Department of Environmental Quality, determining the county would need to apply for funds to manage its monitoring and potential cleanup.

So far, the county has not done so. Mason Leavitt, GIS analyst and program coordinator with Beyond Toxics and a Eugene resident, often advocates for landfill restrictions in the state. He said the landfill represents a quandary for regulators, since records exist for just two of its 12 years of operating life, providing only a limited window into what’s buried beneath the park.

But the popular park’s connection to a yearslong Superfund cleanup just up the road also associated with J. H. Baxter’s wood treatment operations presents a troubling picture to residents.

“Until voluntary cleanup is done and all of these things are fully scoped out, I think people are still gonna wonder and feel some level of unease, especially given the site’s relationship to an ongoing environmental disaster,” Leavitt said.

Read the full story here

Take a peek at our new Data Center Reporter

RCRA forced thousands of landfills to close. What happened to them? Read More »

China Greeted World Leaders With 151 Dancing Robots

From The Robotics Newsletter

As world leaders arrived in Shenzhen for this week’s APEC summit, the city put on a robot show. On November 17, a total of 151 humanoids danced in sync to set a Guinness World Record, while robots nearby sparred in a metal cage and scooped ice cream for visitors, Reuters reported. EngineAI’s T800, a full-size humanoid that stands 1.73 meters and weighs about 75 kilograms, led the routine.

The record it broke was barely three weeks old. AGIBOT set it with 110 robots in Jinan on October 24. The show was also a pitch to visiting executives: Unitree founder Wang Xingxing is on the APEC CEO Summit agenda, and Elon Musk traveled to Shenzhen with President Trump, The Next Web reports. The record measures how many robots can move together, not how well they work.

 

China Greeted World Leaders With 151 Dancing Robots Read More »

Trump’s plan to get the world hooked on US energy

The president is pursuing a wave of overseas fossil fuel infrastructure projects that could tie the world to American gas for decades.

 

By Zack Colman, Politico, 11/18/2026

ANTALYA, Turkey — President Donald Trump is inking tens of billions of dollars in natural gas infrastructure deals from Europe to Africa, in a striking move meant to ensure his fossil fuel legacy lasts decades beyond his presidency.

The projects stand to cement American gas as a centerpiece of overseas markets for years to come, with sprawling consequences for the competitiveness of renewable energy and global efforts to reduce the fossil fuel emissions driving climate chang

“A lot of that infrastructure will be well underway and not reversible by the end of the Trump administration,” said Rich Goldberg, who served on Trump’s White House Energy Dominance Council. “The import terminals are up and running. Gas is coming in.”

Take a peek at our new Data Center Reporter

Trump’s plan to get the world hooked on US energy Read More »

After gutting newsrooms, McClatchy plans to rebuild itself around AI

 

The local journalism that has long powered the 169-year-old company is no longer a viable business model, executives told McClatchy employees during a virtual town hall this month.

 

Two months after McClatchy Media laid off more than 90 journalists nationwide, executives at the storied local newspaper chain offered a blunt assessment of its future.

The award-winning local journalism that has long powered the 169-year-old company was no longer a viable business model, executives told McClatchy employees during a virtual town hall this month, and its survival depended on a wholesale reinvention — centered entirely around artificial intelligence.

From the rollout of new lifestyle websites that feature AI-generated articles and sponsored content to legal review and finance, executives revealed how AI is now integrated into virtually every part of the company. The demonstration comes after McClatchy, one of the nation’s largest newspaper conglomerates, carried out deep staff cuts in September at the Miami Herald, The Kansas City Star, and more than a dozen other local news outlets. An anonymous “person close to the executive decision-making” told The New York Times the layoffs were not about AI and were instead about “business performance in some areas.”

Editor’s Note: McClatchy owns the Centre Daily Times in State College, Pa. It does not own any daily newspapers in NJ or NY.

“We cannot continue to do the same things because the marketplace has changed,” McClatchy CEO Tony Hunter told staff during the off-the-record Nov. 6 meeting, according to audio provided to Nieman Lab. Executives told staff that McClatchy-owned publications have suffered a 17% decline in paid digital subscribers in the last year — and unique visitors have plummeted 39%.

Photo of a slide with audience figures shown during the town hall meeting

 

A companywide blueprint presented during the meeting highlights how McClatchy is systematically outsourcing the infrastructure for local news to AI agents — and rebranding around lifestyle verticals for sports fans, outdoor enthusiasts, and true-crime junkies.

Dubbed “Project Catalyst,” the companywide restructure will create an “AI-native operating model” that takes “repeated tasks off of humans” and embeds AI agents “directly into the daily workflow,” Jeff Dorsey, McClatchy’s chief operating officer, said at the town hall. Dorsey described the initiative as an effort to automate “non-core as well as core functions,” “get rid of things that just don’t offer the same value” they once did, and “provide cash, frankly, to keep the business afloat.”

McClatchy, which operates 29 daily newspapers across 14 states, didn’t respond to multiple requests for comment.

Read the full story here

After gutting newsrooms, McClatchy plans to rebuild itself around AI Read More »

Trump continues to wage war against Atlantic offshore wind projects

New Jersey beach
Plans for the wind farm near Atlantic City had been postponed but the Army Corps says it is now planning a review of the approval 
 

The Trump administration’s opposition to the offshore wind energy sector continues with a series of efforts to review previously approved projects. In the latest development, the U.S. Army Corps of Engineers confirmed on Tuesday, November 17, that it plans to review the previously issued approval for the Atlantic Shores South project, proposed but later postponed by France’s EDF Renewables.

The project is one of four lease areas held by the company off the southern coast of New Jersey. The Atlantic Shores South project is on a federal lease that dates to an auction in November 2015, through a competitive lease sale, and was executed with US Wind in March 2016. In 2018, the lease was assigned to EDF Renewables.

The Army Corps was one of the many reviews the project had to undergo during the approval process. It proposed up to 200 wind turbines to be located about nine miles off the coast of Atlantic City, New Jersey. Despite strong local opposition, the project received approval for its Construction and Operations Plan in September 2024.

The project was proposed in the New Jersey solicitations, but encountered delays and did not proceed. It was not selected by New Jersey, and then Shell, which was one of the partners, announced it was withdrawing from offshore wind energy. EDF had said it still wanted to proceed with the project, but in June 2025, reports said they had filed with the New Jersey Board of Public Utilities to terminate its Offshore Renewable Energy Certificates (OREC).

The Environmental Protection Agency has also challenged the Atlantic Shores South project. It said it would review the permitting, contending the prior administration had rushed the review.

Continue reading the story here

Take a peek at our new Data Center Reporter

 

 

Trump continues to wage war against Atlantic offshore wind projects Read More »